Industrial engineer using digital tablet programming robotic arm in modern factory
INTERACTIVE CALCULATOR

Manufacturing IT
Downtime Cost Calculator

Calculate the true cost of IT downtime for your Dallas-Fort Worth manufacturing facility. See exactly how much unplanned outages are costing your bottom line.

$260K
Average Hourly Cost
14hrs
Avg Annual Downtime
82%
Is Preventable
$3.6M
Typical Annual Loss
Real Industry Data
Instant Results
Downloadable Report
DOWNTIME CALCULATOR

Calculate Your IT Downtime Costs

Enter your facility's information to see the true financial impact of IT downtime on your manufacturing operations

Your Facility Information

Employees affected when systems are down

$

Include wages + benefits (typically 1.3x base wage)

$

Gross revenue generated during production hours

%

Net profit as percentage of revenue

Industry average: 14 hours/year (if unsure, use default)

Your Downtime Cost Analysis

Cost Per Hour of Downtime
$0

Labor costs + lost revenue per hour

Total Annual Downtime Cost
$0

Based on 14 hours of downtime per year

Lost Revenue Annually
$0

Production value not captured

Lost Profit Annually
$0

Direct impact to bottom line

Prevention ROI

Preventing just 82% of downtime with managed IT services typically costs 30-40% of your annual downtime cost.

Potential Annual Savings: $0

By investing in proactive IT management

Want a Detailed Analysis?

Schedule a free IT assessment and we'll provide a comprehensive downtime risk analysis specific to your facility

Schedule Free Assessment